Signalling on the Spa Valley Railway

Spa Valley Railway » Enthusiasts » Signalling on the Spa Valley Railway

Groombridge Signalling Scheme
Phase 1 of the Groombridge Signalling Scheme was brought into use on Friday 1st August 2014, just in time for our Summer Diesel Gala.
Phase 2 of the Groombridge Signalling Scheme was brought into use on Wednesday 3rd July 2016, again in time for our Summer Diesel Gala.
Phase 3 of the Groombridge Signalling Scheme will see Signals No.4, 13, 16 & 20 being brought into use. 

Fixed Signals

  • GBR No.1R – Down Distant (Fixed)
  • GBR No.1 – Down Outer Home
  • GBR No.2 – Down Inner Home
  • GBR No.3 – Down Starting
  • GBR No.5 – From Platform Shunt
  • GBR No.17 – Up Starting
  • GBR No.18 – From Down Loop Up Starting
  • GBR No.19 – From Single Line Shunt
  • GBR No.19R – Up Distant (Fixed)

Stop Boards

  • GBR No.13 – From Up Loop to Main Shunt
  • GBR No.16 – Up Advanced Starting

Points

  • GBR No.6 – Facing Point Lock
  • GBR No.7 – Loop Points East (Mechanical)
  • GBR No.14 – Loop Points West (Electrical - HW1000 Point Machine)
  • GBR Ground Frame No.3 – From Loop to Engineers/Carriage Sidings
  • GBR Ground Frame No.4 – Facing Point Lock on No.3 and Ground Frame Release

Running through No.3 and No.14 points are two DC track circuits. 


Groombridge Signal Box is now in use all the time to control the passing of our trains, we are therefore seeking those interested in becoming Signalman! Please join our society and email our Volunteer Liaison Officer here.